Slot Thailand

HOW TO CONTACT US

1Via phone +62 21 8068 3018
2Email: support@triasmitra.com
3Our office

If you still have problems, please let us know. Thank you!

OFFICE HOURS

Mon-Fri 9:00AM - 5:00PM
Sat-Sundays by appointment only!

FORGOT YOUR PASSWORD?

*

     

  • TRIASMITRA GROUP
  •  

  • 27 YEARS OF EXPERIENCE IN TELCO INDUSTRY
  •  

  • DEVELOPER, MANAGED SERVICE AND CONTRACTOR BUSINESS
  •  

  • MORE THAN 10,000 KM OF SUBMARINE AND INLAND CABLE DEPLOYED

To prevent customer’s fiber optic assets for 7 x 24 hours from any disruption of shipping traffic (anchor), fishing activities, underwater development activity (underwater installation for oil and gas) and vandalism through regular traffic monitoring and patrol marine.

What we did :
  • Warning Call Sign will be delivered for any vessel that stop at or cross to the Safety Zone Area with speed ≤ 2 knots.
  • Daily marine patrol using high speed patrol boat surrounding of submarine cable Safety Zone Area to protect cable from any disruptions.
Project :
  • Sunda Strait Marine Patrol
  • JIBACS Marine Patrol

B2JS is a 24 cores high speed submarine cable system connecting Jakarta-Bangka-Batam-Singapore. To support IRU or core purchased by customers Triasmitra also build NOCs in Jakarta, Bangka and Bintan area for rental space.

Colocation Facilities :
  • Space for equipment.
  • Power Supply (AC) including KWH meter.
  • Generator Set as Back Up for Power Supply (AC).
  • Smoke Detector and Fire Alarm.
  • Fire Extinguisher and Grounding System.
SYSTEM DESIGN : 

A. Link Distance

  • Total Length : 24.5 km

B. Customer

  • PT. PGAS Telekomunikasi Nusantara (2010)

MBDC (Moratelindo Batam-Dumai Cable System) is a high speed submarine cable system of 24 cores connecting Sumatra island (Dumai) to Batam island.

SYSTEM DESIGN : 

A. Link Distance

  • Total Length : 284.5 km

B. Customer

  • PT. Mora Telematika Indonesia (Moratelindo) - 2009

 

System Design :
  • Customer: Biznet
  • Type Inland
  • Start : Q-3 2014
  • RFS : Q-1 2015
  • Total Length of Cable : 357 KM

LATEST NEWS

VIEW ALL -
  • Strategi Transformasi Digital PT Triasmita: Meningkatkan Efisiensi dan Daya Saing
    30 April 2025 by Administrator, in NEWS
    Strategi Transformasi Digital PT Triasmita: Meningkatkan Efisiensi dan Daya Saing
    Di era digital yang berkembang pesat, transformasi digital bukan lagi sekadar opsi melainkan...
    Read More +
  • PT Triasmitra Kini Perusahaan Terbuka, Siap Mendukung Pembangunan Infrastruktur Berkelanjutan
    07 May 2025 by Administrator, in NEWS
    PT Triasmitra Kini Perusahaan Terbuka, Siap Mendukung Pembangunan Infrastruktur Berkelanjutan
    Read More +
  • Menggali Potensi Transformasi Digital: Studi Kasus PT Triasmita
    30 April 2025 by Administrator, in NEWS
    Menggali Potensi Transformasi Digital: Studi Kasus PT Triasmita
    Di era globalisasi ini, transformasi digital bukan lagi sekadar tren melainkan imperatif strategis...
    Read More +

 

TOP