Slot Thailand

HOW TO CONTACT US

1Via phone +62 21 8068 3018
2Email: support@triasmitra.com
3Our office

If you still have problems, please let us know. Thank you!

OFFICE HOURS

Mon-Fri 9:00AM - 5:00PM
Sat-Sundays by appointment only!

FORGOT YOUR PASSWORD?

*

     

  • TRIASMITRA GROUP
  •  

  • 27 YEARS OF EXPERIENCE IN TELCO INDUSTRY
  •  

  • DEVELOPER, MANAGED SERVICE AND CONTRACTOR BUSINESS
  •  

  • MORE THAN 10,000 KM OF SUBMARINE AND INLAND CABLE DEPLOYED

B2JS is a high speed submarine cable system of 24 cores of connecting Jakarta-Bangka-Batam-Singapore. Cable-system covers more than 1,000 kilometers in total cable length which consists of both submarine and inland with capacity up to 380 Gbps.

Link Distance : 

A. Sub-System Jakarta to Batam

  • Submarine Part (length 723 km)
  • Inland Part (length 293 km)

B. Sub-System Batam to Singapore

  • Submarine Part (length 36 km)
  • Inland Part (length 18 km)

Surabaya – Denpasar Cable System is a high speed submarine and inland cable system of 24 cores (submarine) and 96 cores (inland) connecting Java island (Surabaya) to Bali island (Denpasar).

SYSTEM DESIGN : 

A. BMH

  • Surabaya, East Java
  • Denpasar, Bali

B. Link Distance

  • Total : 520.1 km

C. Cable Specs

  • Submarine Cable :24 cores G. 655 C (wet part) & 2 x 24 cores G.655C (dry part)
  • Inland Cable : 96 cores G. 652 D

JBCS is the first segment deployed in Phase 1 of the Ultimate Java Backbone Project, connecting Jawa – Bali via Muncar – Candi Kesuma (27 km)

What we did
  • Marine Survey
  • Desktop study
  • Design and Engineering
  • Construction
  • Shore End
  • Procurement

JIBA CS (Jambi Batam Cable System) is a high speed submarine cable system of 36 cores connecting Sumatra island (Kuala Tungkal) to Batam island (Tanjung Pinggir).

SYSTEM DESIGN : 

A. BMH

  • Kuala Tungkal, Jambi
  • Tanjung Pinggir, Batam

B. Link Distance

  • Submarine portion : 266.58 km

C. Cable Specs

  • Submarine Cable (SA / DA) : ITU G.654.C
  • Cores : 36 fiber

Ultimate Jawa Backbone is a high speed inland cable system of 96 cores connecting Java island.

SYSTEM DESIGN : 

A. BMH

  • Java island

B. Link Distance

  • Total : 2661 km

C. Cable Specs

  • Inland Cable : 96 cores G. 652 D

LATEST NEWS

VIEW ALL -
  • Strategi Transformasi Digital PT Triasmita: Meningkatkan Efisiensi dan Daya Saing
    30 April 2025 by Administrator, in NEWS
    Strategi Transformasi Digital PT Triasmita: Meningkatkan Efisiensi dan Daya Saing
    Di era digital yang berkembang pesat, transformasi digital bukan lagi sekadar opsi melainkan...
    Read More +
  • PT Triasmitra Kini Perusahaan Terbuka, Siap Mendukung Pembangunan Infrastruktur Berkelanjutan
    07 May 2025 by Administrator, in NEWS
    PT Triasmitra Kini Perusahaan Terbuka, Siap Mendukung Pembangunan Infrastruktur Berkelanjutan
    Read More +
  • Menggali Potensi Transformasi Digital: Studi Kasus PT Triasmita
    30 April 2025 by Administrator, in NEWS
    Menggali Potensi Transformasi Digital: Studi Kasus PT Triasmita
    Di era globalisasi ini, transformasi digital bukan lagi sekadar tren melainkan imperatif strategis...
    Read More +

 

TOP