- Published: Monday, 15 January 2018 07:14
- Hits: 10780
B2JS is a high speed submarine cable system of 24 cores of connecting Jakarta-Bangka-Batam-Singapore. Cable-system covers more than 1,000 kilometers in total cable length which consists of both submarine and inland with capacity up to 380 Gbps.
Link Distance :
A. Sub-System Jakarta to Batam
- Submarine Part (length 723 km)
- Inland Part (length 293 km)
B. Sub-System Batam to Singapore
- Submarine Part (length 36 km)
- Inland Part (length 18 km)
- Category: Portfolio Carousels
- Published: Monday, 04 September 2017 11:14
- Hits: 3898
Surabaya – Denpasar Cable System is a high speed submarine and inland cable system of 24 cores (submarine) and 96 cores (inland) connecting Java island (Surabaya) to Bali island (Denpasar).
SYSTEM DESIGN :
A. BMH
- Surabaya, East Java
- Denpasar, Bali
B. Link Distance
- Total : 520.1 km
C. Cable Specs
- Submarine Cable :24 cores G. 655 C (wet part) & 2 x 24 cores G.655C (dry part)
- Inland Cable : 96 cores G. 652 D
- Category: Portfolio Carousels
- Published: Friday, 22 March 2013 11:14
- Hits: 3543
JBCS is the first segment deployed in Phase 1 of the Ultimate Java Backbone Project, connecting Jawa – Bali via Muncar – Candi Kesuma (27 km)
What we did
- Marine Survey
- Desktop study
- Design and Engineering
- Construction
- Shore End
- Procurement
- Category: Portfolio Carousels
- Published: Friday, 22 March 2013 11:14
- Hits: 3906
JIBA CS (Jambi Batam Cable System) is a high speed submarine cable system of 36 cores connecting Sumatra island (Kuala Tungkal) to Batam island (Tanjung Pinggir).
SYSTEM DESIGN :
A. BMH
- Kuala Tungkal, Jambi
- Tanjung Pinggir, Batam
B. Link Distance
- Submarine portion : 266.58 km
C. Cable Specs
- Submarine Cable (SA / DA) : ITU G.654.C
- Cores : 36 fiber
- Category: Portfolio Carousels
- Published: Friday, 22 March 2013 11:14
- Hits: 6702
Ultimate Jawa Backbone is a high speed inland cable system of 96 cores connecting Java island.
SYSTEM DESIGN :
A. BMH
- Java island
B. Link Distance
- Total : 2661 km
C. Cable Specs
- Inland Cable : 96 cores G. 652 D
- Category: Portfolio Carousels
LATEST NEWS
VIEW ALL --
30 April 2025 by Administrator, in NEWS
Strategi Transformasi Digital PT Triasmita: Meningkatkan Efisiensi dan Daya Saing
Di era digital yang berkembang pesat, transformasi digital bukan lagi sekadar opsi melainkan...Read More + -
07 May 2025 by Administrator, in NEWS
PT Triasmitra Kini Perusahaan Terbuka, Siap Mendukung Pembangunan Infrastruktur Berkelanjutan
Read More + -
30 April 2025 by Administrator, in NEWS
Menggali Potensi Transformasi Digital: Studi Kasus PT Triasmita
Di era globalisasi ini, transformasi digital bukan lagi sekadar tren melainkan imperatif strategis...Read More +